Building Construction Price Index Members
Q3 2026 🔒 Members only

Building Construction Price Index: Member Dashboard

What it means for your work

Pick your role

The index shows where prices stood in mid-August. Use it to test a budget or a bid, then confirm with current quotes.

15 cities compared

Where London ranks

Measure
LondonOther cities15-city compositeOntario

Select a city to open its trend below. Source: Statistics Canada, table 18-10-0289-01. Index 2023 = 100.

Trade divisions (MasterFormat)

Look up your trade

Where the increase comes from

Division over time

Annual price change, non-residential buildings. Select any row in the table to chart it.

Weight is the division's share of the building type's price in that place. Points = weight × annual change, the amount each division adds to the overall rate. Structural and architectural divisions are priced from a contractor survey; mechanical and electrical from administrative data.

Six model buildings

London is higher for every building type

Annual price change by model building, latest quarter.

Mostly price, less the mix of buildings

Prices rising faster within each typeMore factory in London's mix

London's weight in the national index

FactoryOther building types
Budget check

Test a budget against the index

Apply the observed change for your place, building type and trade to a scope of work. It looks back, so treat it as a test of a budget and get current quotes before you commit.

CAD
Period
Tariff timing

Steel was rising before September

LondonCanada (15 cities)

Structural steel framing, annual price change, non-residential buildings.

What the evidence supports

Measured, context and open questions

Use it for
  • Benchmarking escalation on comparable scope
  • Comparing cities, building types and divisions
  • Spotting divisions that need fresh quotes
Add current evidence for
  • Pricing a bid today
  • Setting contract price-change terms
  • Work outside the London CMA
It cannot give you
  • A current quote or a total project budget
  • Cost per square foot
  • The tariff share of a price change
Method, sources and limits

How to read these figures

What the index measures

The index tracks quarterly changes in the price contractors charge to construct six representative non-residential buildings: an office, a warehouse, a shopping centre, a factory, a school and a bus depot. The price includes materials, labour, equipment, overhead and profit. It excludes land, design, development charges, real estate fees and value-added taxes.

Statistics Canada groups the factory and bus depot as industrial, and the office, warehouse and shopping centre as commercial. Index levels show change since 2023 and say nothing about cost per square foot between cities.

What counts as London

How LDCA made its calculations

Division points. Each division's weight in the selected index, multiplied by its annual price change. Points sum close to the published rate; the small difference arises because weights are updated once a year.

Mix and price. London's gap over Ontario is split across the six building types. The mix part is half the difference in weights times the sum of the two rates. The price part is half the difference in rates times the sum of the two weights.

Budget check. Value × observed change for the place, building type and trade selected. It is a look back, not a forecast.

Limits. Weights change once a year, so a split across four quarters is an approximation. Statistics Canada publishes no response counts or margins of error by city.

Sources
ID Source Used for Date
London & District Construction Association

Questions: Kerry Rajotte, Director of Membership Development & Education · 519-453-5322 · kbrajotte@ldca.on.ca

Contact Us

London and District Construction Association

331 Aberdeen Dr.

London, ON N5V 4S4

Follow Us

Accessibility Policy | Privacy Policy